Transfer to a suitable container and apply a thin but even coat with a paint pad to one paver at a time, finishing the application at the joint (if applied to joints some enhancement may occur).
Using a dry, absorbent cloth, buff the paving surface reducing shine as you go. Failure to do so may result in a slippery surface when wet.
Optimum performance is reached after 7 days. Once an application has been applied do not walk or drive on the coated area for at least 24 hours after application or until fully dry. Allow product to cure for at least 24 hours before subjecting to heavy use - increase this time in cold, damp conditions.