EASYPatio Joint Repair


Overview

EASYPatio Joint Repair

EASYPatio Joint Repair EASYPatio Joint Repair EASYPatio Joint Repair

Quick, EASY, and money saving patio joint repairs.

  • Ready to use with no mixing required
  • Suitable for use on all paving types*
  • Simple to apply
  • Activated by water - no portland cement
  • No waste
  • Strong & durable
  • Resists weed growth**

Find your nearest stockist

* Joint width must exceed 1.6mm
** Tap-root weeds will require removing/neutralising

EASYPatio Joint Repair is a high-tech product for the renovation of failing mortar joints in patios and paths. It is a mixture of graded sand and special binders that is applied dry and activated with water. Once cured, it forms a strong, flexible joint that deters weeds and crawling insects.

An easy-to-use alternative to traditional mortar joints.

Usage - Ideal for areas of paving where existing mortar joints have failed in some areas and not others. Save money by only repairing the sections that need it.

Ready to use, EASYPatio Joint Repair allows for quick and easy jointing. It adheres to the sides of the paving without shrinking. It is resistant to erosion caused by water, frost, wind, cleaning, etc. Efflorescence-free.

Videos


Demonstration Video

Installation Guide

Protect eyes, skin & wear a face mask. Areas for repair should be dry and free from loose debris and have a minimum depth of at least 20mm. Do not use below 10 degrees C.

EASYPatio Joint Repair - Open

Step 1. Open

Open the tub and tip out enough material to fill the joint areas being repaired.

EASYPatio Joint Repair - Sweep

Step 2. Sweep

Sweep the product into the joints until full.

Step 3. Firm

Gently firm the surface with a suitable tool and apply more product as required until the level of the joint is just below the surface of the paver.

Step 4. Wet the Joints

Use a fine spray to wet the joints until no more water is absorbed.

CAUTION! DO NOT OVER WATER

Joints should not be exposed to further wetting for at least 90 minutes after installation. The area can be walked on immediately but avoid disturbing the joints. Full strength is achieved after 30 days.

Step 5. Clear

To avoid any staining, a leaf blower is recommended to clear any fine sand particles off the surrounding paving before wetting, although this is not mandatory.

Step 6. Store

The product should be stored in its original packaging, in a dry, well-ventilated place out of direct sunlight

Keep container tightly closed and sealed until ready for us

Containers that have been opened must be carefully resealed and kept upright to prevent leakage

Shelf life: Unlimited if kept in optimum conditions