The UK and Europe are set for a particularly hot period of weather over the weekend.
In hot weather, paving can get very hot and the water used in the application process of EASYJoint can dry off very quickly so our advice in weather like this is to saturate the paving and continue to keep it wet by running a hose over it continuously, the wetter better. It is important to keep topping up your working area to make sure it remains as wet as possible.
Always remember to wash the paving down after installation, removing any remaining grains of sand which may remain sitting on top of the paving slabs, making sure you remove any excess residue which may sit on the top before allowing the patio to dry.
The Wetter the Better
For our full list of products visit: http://www.azpects.co.uk/products.aspx
Azpects on Facebook: https://www.facebook.com/AzpectsLtd/
Azpects on Twitter: https://twitter.com/AzpectsLtd
For further help Azpects offer a Customer & Merchant Support Helpline: +44 (0)1473 760777